Our Process

We follow a systematic, proven approach to ensure every project meets the highest standards of quality, compliance, and client satisfaction.

Project Lifecycle

1

Consultation

Site assessment & requirements

2

Survey

Hydrogeological investigation

3

Quotation

Detailed proposal & agreement

4

Drilling

Borehole construction

5

Testing

Pump testing & development

6

Installation

Pump & equipment setup

7

Handover

Documentation & training

Drilling Process

🏗️

Site Setup

Equipment mobilization

1
🔄

Drilling

Penetration to target depth

2
⬇️

Casing

Installation of well casing

3
💎

Gravel Pack

Filter material placement

4
🌊

Development

Well cleaning & testing

5

Test Pumping

Yield assessment

6

Borehole Cross-Section

Ground LevelCement SealClay SealSandGravel PackScreenCasingSump0mWaterBottom🚧

Cross-section showing typical borehole construction

Quality Assurance

Every project follows strict quality control procedures to ensure compliance with Kenyan regulations and international standards.

During Drilling

  • Formation sampling every 2 meters
  • Water strike recording at each encounter
  • Daily drilling logs and progress reports
  • Yield estimates at 10m intervals
  • Supervisor approval at key stages

Post-Completion

  • 24-hour constant rate test pumping
  • Water quality laboratory analysis
  • WRMA-compliant completion reports
  • As-built drawings and documentation
  • Client training on equipment operation

Typical Project Timeline

Survey

Hydrogeological investigation

1-3 days

Mobilization

Equipment transport and setup

1-2 days

Drilling

Depends on depth and geology

3-7 days

Test Pumping

Includes 24-hour test

2-3 days

Installation

Pump and control panel

1-2 days

Handover

Documentation and training

1 day

Total Project Duration

2-4 Weeks

Depending on depth and complexity