Unilever Kenya Factory Water Supply
Kiambu County, Kenya
Client
Unilever Kenya Ltd
⚠️The Challenge
Unilever's manufacturing facility required 500,000+ liters of treated water daily. Municipal supply was unreliable and insufficient for production needs, causing costly production stoppages.
✓Our Solution
Unihydro designed and installed a complete industrial water solution: deep high-yield borehole (300m), automated pumping station, multi-stage treatment plant (filtration, softening, UV disinfection), and 500,000-liter storage reservoir with distribution system.
📊Results & Impact
- ▸500,000+ liters/day reliable water supply achieved
- ▸Zero production stoppages due to water since installation
- ▸Water quality consistently meets KEBS and internal standards
- ▸30% reduction in water costs compared to municipal supply
- ▸System designed for expansion to support future growth
⚙️Technical Specifications
Borehole Depth
300 meters
Water Yield
25,000 liters/hour sustained
Pump Type
Grundfos SP submersible 15kW
Casing
Stainless steel 10-inch
"Unihydro's industrial water solution has been critical to our operations. The system's reliability and water quality have exceeded our expectations. Highly recommended for industrial applications.