⚠️The Challenge

Unilever's manufacturing facility required 500,000+ liters of treated water daily. Municipal supply was unreliable and insufficient for production needs, causing costly production stoppages.

Our Solution

Unihydro designed and installed a complete industrial water solution: deep high-yield borehole (300m), automated pumping station, multi-stage treatment plant (filtration, softening, UV disinfection), and 500,000-liter storage reservoir with distribution system.

📊Results & Impact

  • 500,000+ liters/day reliable water supply achieved
  • Zero production stoppages due to water since installation
  • Water quality consistently meets KEBS and internal standards
  • 30% reduction in water costs compared to municipal supply
  • System designed for expansion to support future growth

⚙️Technical Specifications

Borehole Depth

300 meters

Water Yield

25,000 liters/hour sustained

Pump Type

Grundfos SP submersible 15kW

Casing

Stainless steel 10-inch

"

Unihydro's industrial water solution has been critical to our operations. The system's reliability and water quality have exceeded our expectations. Highly recommended for industrial applications.

Peter Mwangi