Tana River County Water Infrastructure
Tana River County, Kenya
Client
Tana River County Government
⚠️The Challenge
Tana River County needed reliable water supply for Hola town and surrounding villages. Existing infrastructure was outdated and could not meet growing demand of 30,000+ residents.
✓Our Solution
Drilled 5 high-capacity boreholes (200-280m depth), installed diesel and solar hybrid pumping systems, constructed 500,000-liter elevated storage tank, and installed 15km of distribution pipeline to serve town and 8 villages.
📊Results & Impact
- ▸30,000+ residents now have piped water access
- ▸Water rationing eliminated in Hola town
- ▸Household water costs reduced by 50%
- ▸Hybrid system ensures 24/7 supply even during power outages
- ▸Revenue to county increased by 200% through improved distribution
⚙️Technical Specifications
Borehole Depth
200-280 meters
Water Yield
10,000-15,000 liters/hour per borehole
Pump Type
Diesel-solar hybrid pumping stations
Casing
Mild steel 8-inch with stainless steel screens
"This project has transformed water service delivery in Tana River. The hybrid pumping system's reliability during power outages has been particularly valuable.
Hassan Obeid
Managing Director, Tana River Water & Sewerage Co.